Business Model for DMS
Services, Planning for Product Selection
Role: Business Strategy
/ Technology Consultant
A data center operating
in the healthcare business is planning to leverage its current
know-how in document scanning and imaging as well as the already
available infrastructure to offer new services in the area of document
management.
In workshops the
possible service offerings have been elaborated and target customer
groups have been identified. Considering the available infrastructure,
different possible system architectures have been discussed and
critical requirements on a new DMS system have been derived. For the
further proceedings a rough project planning has been established. In
cooperation with
cbs-network
financing possibilities for the project have been investigated
As a Result
the business model has been refined
and stabilized from the market and IT perspective. A project plan /
schedule has been created for the further steps. The consulting in the
financing area will most certainly lead to considerable savings in the
implementation project.
Outlook:
-
Further product
selection - longlist, queries, shortlist, request for proposals,
lab, prototype, pilot customer
-
Planning for and
support in execution and evaluation of laboratory tests, prototype
and pilot systems
-
Creation of a
procedure / methodology for implementing new customers
-
Support in
calculation methods and defining service pricing
-
Support in marketing
and sales (lectures / customer visits, especially large scale
prospects)
|
|
|
High
Scalability Systems Architecture for
a Process
Management System
Role:
Systems Architect
For a project at a large scale user company
with an expected number of concurrent users posing
high-level
requirements on the underlying
systems architecture concerning scalability and reliability,
a systems architecture was designes that fulfills
these requirements through a distributed component based system.
Important components are workflow management,
forms management and
a database server. As
peripheral systems SAP, a document archive and
a legacy system are embedded into the architecture.
After
evaluating the customer's requirements the architecture basics have
been designed and verified in workshops together with the producers pf
these components. Any arising questions have been discussed with the
responsible contact persons on the customer side.
As a
Result
a reusable white
paper has been created,
which will also be used in future projects.
Outlook:
-
Refining the architecture
into a technical
design
-
Implementing a prototype system for design verification
-
Execution or coaching of project management for the
implementation
project
|
|
|
Concept
for Introduction of a Subsidiary-Spanning ERP-
and Project
Controlling System
Role:
Management Consulting
ERP/MIS and Process
Optimization,
Project Manager
Starting in a situation where a new company has been brought together
from existing subsidiaries (approx. 350
employees in 4 countries)
with very different solutions in
the various areas for time management,
project
controlling,
material management, finance,
controlling,
and consolidation,
the company was looking for an integrated application
which covers all these requirements and removes media breaches and
interfaces.
In different workshops
the existing systems have been evaluated, key-users have been
identified, a requirements profile for the subsequent system has been
collected and a functional concept for implementing the new company
structure (divisions with legal units by country) into a cost center
framework has been developed. It has been decided to replace the
existing systems by a new common solution. The requirements profile
was assigned to the various modules of a new application, discussed
with the IT infrastructure department and used as a base for a product
selection process. On the base of the ERP-system Navision and a branch
solution for project- and service-business some preparing workshops
for a later introduction of the system have been planned and performed.
As a
Result
there is a complete
concept for ERP introduction consisting of a requirements catalog,
a project organization structure (project
management, steering committee, project team, key users),
and the results of the preparing workshops in form of
a requirements specification.
Outlook:
-
Finalization of a
product decision and introduction of the system,
-
Extension into the direction of a close integration with software
products used for project planning
-
Distributed use (cooperating sites in different countries, project
teams at their customers)
-
Usage
of system integration and business intelligence technologies in the
areas controlling / project controlling
|
|
|
Process
Orientation in
Warehouse-Management
Role:
Management Consulting
SCM and Process
Optimization
During
a workshop, which was conducted in the role of a consultant and coach,
a preliminary study about core processes in the area of warehouse
management and logistics processes has been created.
Afterwards optimization of resource planning and
capacity loading has been defined as a target for further
investigation.
A
project team at the customer has been
instructed to collect relevant information on processing of the
incoming customer orders.
After a short analysis
and preparation phase another workshop was held to create a simulation
model using a process modelling and simulation tool brought in by the
consultant. The model was verified, refined and ultimately used as a
base for process simulation.
The
technical
Result
was a simple tool
with minimal requirements on the underlying IT infrastructure, which
is able to calculate required hours by differend employee skill
profiles and a schedule for the next day, after entering a few key
data on incoming orders which can be derived from
the existing warehouse management application. As
economical "side
effect" the project has created the base
for daily transparent project controlling in warehouse management.
Given
the possibility to at least partly fill the employee pool by dynamic
orders, direct savings are expected, so that there will be a ROI that
exceeds the process consulting cost in a
minimum time.
Ausblick:
-
Extension of these procedures to further core processes,
-
Introduction of simple controlling tools which
allow direct viewing of daily key indicators, and as far as
justified by the savings achieved so far:
-
Introduction of process management procedures with IT technical
support (workflow)
-
Usage
of system integration and business intelligence technologies in the
areas controlling / project controlling
-
Extension by a
calculation module to enable carrying back the controlling results
into the quotation process.
|
|
|
IT Concept
for Controlling and Monitoring of Import/Export Processes
Role:
Management Consulting
SCM and Process
Optimization,
System Architect
During a few
preliminary meetings, the available infrastructure of a
logistics service provider and its local logistics partner
company in South Africa was investigated. Details have been
clarified with the respective software suppliers.
A short visit in Johannesburg was used to
collect information on logistical frame conditions and
requirements of the outsourcing customer of the logistics
service provider. In addition the customer's IT infrastructure
was investigated and interfaces have been defined.
Production of an IT solution
concept including a systems architecture for
processing the import and export business with complete control
and monitoring for these processes from discovering the material
requierements resp. its entry in the customer's MRP system up to
import processing starting with monitoring the last production
stages until delivery. The systems architecture provides for
transparency throughout this complete process (including
connection to the appropriate air and sea freight tracking
systems). Arising exception situations (e.g. delays) are
proactively treated and reported, if appropriate also the
customer (systems) are actively involved in avoiding the problem.
A central process management (workflow) system builds the
technical base for the solution.
As a
Result the
system allows a close communication of the involved partners.
By extensively automating standard activities,
decisions and interfaces the process managers can concentrate on
exception handling and their core business.
Outlook:
-
Generalization
of this approach for use in different logistics- and
outsourcing-projects
-
Developing an ASP-model for simple reuse through different sites,
customers and projects,
-
Investigation of possibilities to extend the technical process
management into supplier and customer processes (outsourcing of
process management or selling the IT solution)
|
|
|
SCM- / E-Fulfillment
B2B2C Solution for Electro-
and Electronics-Industry
Role:
Management Consulting
SCM and
eBusiness,
System Architect
On behalf of a logistics
service provides the systems architecture and a solution concept
for integration of all participants in the B2B2C process was
developed. Members of the projects were experts
from the partner companies HP, Broadvision and i2.
The solution
provides a possibility for end customers ("...2C") to an
eCommerce platform. By an appropriate integration of backoffice
systems of an elctro company an its business partners and dealer
organization ("B2B...") as well as the systems of the logistics
service provider the complete network of business processes from
CRM via supply-chain management and fulfillment can be covered.
Central components actively drive process management and
processing and storage of the resulting documents. The B2B
communication is done on the base of EDI and XML.
As a
Result
a systems architecture,
a marketing concept and a planning for
developing a prototype system have been produced.
Outlook:
|
|
|
Workflow-Integration in
ERP-Applications
Role:
Project
Manager, System Architect
After a deeply
analysing the workflow management system COSA Workflow, a
well-known ERP software company decides to cancel its own
product development in this area and use COSA Workflow instead.
In the resulting project for integration of this workflow system
with the modelling tools and application components of the ERP
system, the architecture design and project management have been
assigned.
Working
together with a project team of more than 40 employees (and a
steering committee on director's board level) the modelling
components have been adapted, model translation components have
been developed, EAI methods for workflow integration into the
ERP applications have been provided and all standard development
cases have been supported. In addition the application
developers received consulting in workflow enabling their
software products. The workflow product development team's
organization has been closely associated into the ERP companies
development processes and methodology.
As a
Result interfaces
between the modelling and application components in the ERP
system on one side and the workflow management system on the
other side have been designed and implemented. Mechanisms for
fast localization into various languages have been built. In the
product development organization an assessment according to the
Capability Maturity Model has been conducted and the development
methodology of the ERP company has been introduced (training and
coaching).
Outlook:
-
Further workflow enabling of the ERP
applications,
-
Using
the scheduling functionality of the workflow management system in
various places of the ERP internal process control mechanisms.
|
|
|
Electronic
Claims-File in
Car Damage Claims-Processing in an Insurance Company
Role:
Management Consulting Process
Optimization and Document Management,
System Architect
Based on the
participation in a working group of the GDV (Association of
German Insurance Companies) for development of an application
architecture for insurances (VAA) with a special focus on
workflow management, the insurance company decides to have a
feasibilty study created. The main topic is the design of an
electronic claims file with workflow and document management as
central components and interfaces to the various host based
systems and to a self-developed client/server based legacy
application.
In close
cooperation with a project team on customer side the relevant
frame conditions are analyzed: volume of incoming documents and
their structure, processes / intermediate results of a parallel
process reengineering project, relevant host applications, their
interfaces and roles in the overall process.
As a
Result
the requested feasibility study if
form of a technical and organisational solution concept has been
developed. This project phase was followed by a request for
proposal and an implementation project for a technical prototype.
In the meantime the pilot operation phase has
been concluded successfully and German wide rollout has started.
The insurance company has aquired company licenses of the
workflow- and document archiving products which have been used
for the project.
Outlook:
-
Further completion of the rollout,
-
Introduction of the system in other claims processing areas,
-
Introduction of the system for contract management processes.
|
|
|
|